Author name: Amy Kemp

Vertical construction starts on The Kindred Hotel. 7.20.23

Construction Update: July 2023 | Vertical Construction Begins for Keystone’s Newest Hotel

The PCL Construction crew is moving quickly with bringing Kindred Resort to life after only breaking ground on the luxury project in the fall of 2022. The team is pouring concrete for the 4th floor of the West Tower, that features 62 luxury residences with a projected opening date of 2025. The Kindred Hotel is

Construction Update: July 2023 | Vertical Construction Begins for Keystone’s Newest Hotel Read More »

news img 2

Limited Number of Kindred Residences Announced for Sale for the Summer Release

Summer is here and The Kindred Resort team has partnered with LIV Sotheby’s International Realty to announce the limited summer release of available luxury residences for purchase. With a phased sales strategy, the team is unveiling seven (7) new construction residences for sale starting in June, 2023. Kindred Resort is expected to open in 2025.

Limited Number of Kindred Residences Announced for Sale for the Summer Release Read More »

Concrete pour

Construction Update: June 2023 | Moving Up to 2nd Floor of Kindred’s West Tower

Summer is arriving to the Snake River Valley and Keystone Resort. Temperatures are rising, along with the construction of Kindred Resort’s West Tower residences. Concrete was poured for the floor of the 2nd level of the luxury units in this premier ski-in, ski-out real estate development. Take a look as Hank Wiethake from LIV Sotheby’s

Construction Update: June 2023 | Moving Up to 2nd Floor of Kindred’s West Tower Read More »

Join our newsletter

Stay up to date with the latest Kindred Resort news.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.